№ 01 ГСЛ-КР №010236
Construction and installation works
Non-transferable, class 1. Electronic document, equivalent to paper. The original is provided on request.
Full-cycle construction of FOCL and utility networks
for government and corporate clients.
Directions
The same columns, equipment and license work on telecom, energy, outdoor utility networks and specialized works.
All directionsTurnkey FOCL construction and mechanized cable laying.
Power supply lines, outdoor electrical networks and site power.
Comprehensive construction of outdoor utility networks and communications.
HDD, pipe jacking under roads, earthworks and trench construction.
Full cycle
We cover the full FOCL construction cycle - from route survey to commissioning. Ten stages, one contractor.
Technology in more detail
Survey
Route, soil categories, obstacles
Design
Design documentation for the route
Mobilization
Equipment delivery with own prime movers
Route staking
Setting out the route on the ground
Earthworks
Trenches, pits, preparation
HDD / pipe jacking
Crossings under roads, railways and rivers
FOCL laying
Mechanized FOC laying at 120 cm
Splicing and measurements
Closure installation, fiber splicing, measurements
As-built documentation
Full set for the site
Handover
Commissioning
Projects
Projects in figures: regional infrastructure, backbone corridors and urban GPON networks.
All projectsProduction capacity
A full set for FOCL construction without hired equipment: columns, HDD, earthworks and mobilization.
All equipmentAnchor project
The company was created to build Freedom Holding's backbone FOCL: a fiber-optic network linking Kazakhstan's cities with exits to neighbouring countries. Those capacities are now available to public and corporate clients.
Permits
State Category II construction-and-installation license: six work groups - from utility networks to linear structures of republican significance.
№ 01 ГСЛ-КР №010236
Construction and installation works
Non-transferable, class 1. Electronic document, equivalent to paper. The original is provided on request.
Verifiable facts
Every point is backed on this site: by a diagram, the fleet list, completed projects or a document.
Ten stages from route survey to handover - one contractor, with no hand-off between subcontractors.
Cycle diagramCable-laying columns, HDD complexes, excavators and trenchers; mobilization to site with own prime movers.
Fleet composition4 253 km of regional network and 942 km of backbone built and handed over; column capacity - up to 1 700 km of cable per month.
Completed projectsFirst issued 12.10.1999; current license No. 01 ГСЛ-КР №010236 with annex — details in the permits section.
Licenses and permitsClients
Six segments: from telecom operators and road infrastructure to the public sector and general contractors.
Backbone and urban FOCL, GPON, communication nodes
Roadside FOCL, ITS, weigh control
Power-supply networks, power transmission lines, substations
Server rooms, video surveillance, communications and situation centres: Interior Ministry, Ministry of Health, Ministry of Education
Utility networks and communications for industrial sites
Specialized works and mechanized columns on subcontract
Completed sites
Recommendations
Official recommendations from clients and partners after working together.
For partners
FOCL, earthworks, HDD, mechanized columns, linear works, power supply and equipment mobilization.
Terms for partnersGallery
Mechanized columns, the equipment fleet and crews on backbone routes.
Newsletter
Completed projects, new equipment and permits - brief, and only when there is something to show. Unsubscribe in any email.
SK Favorit assistant
AI answers from the website content
Answers are AI-generated and may contain mistakes. Please do not share personal data in the chat - privacy policy.