Cable-laying columns
16Mechanized FOCL laying in the ground to a depth of 120 cm.
Up to 40 km a day in tandem, totaling up to 1 700 km of cable a month.
- Shantui SD34 - 6
- Shantui SD32 - 8
- Shantui SD22 - 2
170 units of specialized equipment in the company fleet: from cable-laying columns to HDD rigs. Mobilization to site - with own prime movers.
Mechanized FOCL laying in the ground to a depth of 120 cm.
Up to 40 km a day in tandem, totaling up to 1 700 km of cable a month.
Earthworks: pits for HDD, trenches on difficult sections, loading.
Hauling heavy equipment between sections, mobilizing columns to site.
Crossings under roads, railway tracks, rivers and utilities.
Mechanized trench excavation on sections where the column does not work.
Loading and delivery of fiber-optic cable drums and materials along the route.
Support works on the route and column support.
Mobility of crews and engineering staff along the full length of the route.
Total 170 units of own equipment. Data: company fleet composition, 2026.
Newsletter
Completed projects, new equipment and permits - brief, and only when there is something to show. Unsubscribe in any email.
SK Favorit assistant
AI answers from the website content
Answers are AI-generated and may contain mistakes. Please do not share personal data in the chat - privacy policy.