HDD and trenchless laying of utilities

Horizontal directional drilling and pipe jacking under roads: we perform crossings under rivers, railways, highways and forest tracts without opening the surface. The own fleet has five Goodeng HDD units; short crossings under sidewalks and carriageways we close by pipe jacking.

Request an HDD crossing estimate

For an estimate, specify the crossing length, diameter, what is being crossed, the utility type and region.

Goodeng HDD unit

Scope of work

Where HDD is used

The cable or pipe goes under the obstacle along a drill trajectory between entry and exit pits.

HDD under a road

Crossing the carriageway without breaking the pavement

HDD under a railway

Crossings under the railway bed

River crossings

Long crossings under the channel without opening the surface

FOCL crossing by HDD

The cable passes the obstacle along a drill trajectory

Casing installation

A protective casing or pipe for the utility

Pipe jacking under a road

Short crossings under sidewalks and carriageways

Stages

How a crossing is performed

Five steps from the pit to the restored site.

  1. Pits

    Entry and exit pits are prepared by own backhoe loaders

  2. Pilot drilling

    The drill head follows the trajectory under the obstacle

  3. Borehole reaming

    The reamer enlarges the borehole to the required diameter

  4. Pulling the casing or pipe

    A pipe or casing for the utility is pulled into the borehole

  5. Restoration

    The pits are backfilled, the site is restored

Equipment

Equipment at the crossing

Drill rigs, equipment for pits and hauling - with the own fleet.

The full fleet
  • HDD complexes

    5 units

    Crossings under roads, railway tracks, rivers and utilities.

    Goodeng - 5

  • Backhoe loaders

    24 units

    Earthworks: pits for HDD, trenches on difficult sections, loading.

    Hidromek 102B - 24

  • Tractor units and lowboys

    11 units

    Hauling heavy equipment between sections, mobilizing columns to site.

    HOWO V7 - 3 · HOWO MAX - 6 · SITRAK - 2

  • Crane trucks

    17 units

    Loading and delivery of fiber-optic cable drums and materials along the route.

    DongFeng 6x6 - 17

Methods

How the crossing method is chosen

Three methods depending on obstacle type and crossing length.

MethodObstaclesApplication
HDD - directional drillingRivers, railway bed, forest tracts, parksLong distances under major obstacles
Pipe jackingSidewalks, carriageway, small obstaclesShort crossings
Trench methodHard-to-reach sections where a bulldozer cannot workOpen excavation, pits for HDD, installation of КОД

Data: the company production program. Diagrams of all three methods - on the Technology page.

Timing and cost

Timing and what affects the cost

The cost of a crossing is calculated from its parameters - describing them in the request is enough.

Crossing length

Distance between the entry and exit pits

Diameter

Diameter of the pipe or casing

What is being crossed

Road, railway, river or utilities

Soils

Soil category along the trajectory

Utility type

FOCL cable, power cable or pipeline

Region and mobilization

Hauling the rig and equipment to site

Request an HDD crossing estimate

For an estimate, specify the crossing length, diameter, what is being crossed, the utility type and region.

Work regions

Where we work

Six regions where the company works. Equipment reaches other sites with our own tractor units.

  • West Kazakhstan Region
  • Atyrau Region
  • Kostanay Region
  • Akmola Region
  • Zhetysu Region
  • Almaty Region
Work map

Licence and permits

Basis of the permit

State Category II construction and installation license № 01 ГСЛ-КР №010236; first issued 12.10.1999.

  • 04Special works in soils

    Drilling works, underwater technical works, works on the continental shelf, foundation construction

  • 06Linear structures

    Power transmission lines up to 110 kV and above, nationwide and international communication lines, oil and gas pipelines

  • 02Roads and railways

    Bases and pavements of category I-V roads, runways, railway tracks

License and annex

Questions and answers

The essentials in brief

How does HDD differ from pipe jacking?

HDD is horizontal directional drilling for long distances under major obstacles: rivers, railway bed, forest tracts. Pipe jacking is for short crossings: sidewalks, carriageway, small obstacles.

Is the road opened during an HDD crossing?

No. The cable or pipe goes under the obstacle along a drill trajectory between entry and exit pits; the pavement above the crossing is not opened.

How many HDD units does the company have?

Five Goodeng units in the own fleet. Pits for crossings are prepared by own Hidromek backhoe loaders - 24 units.

What data is needed to estimate an HDD crossing?

Crossing length, pipe or casing diameter, what is being crossed, the utility type and region.

Do you perform HDD as a separate subcontracted work type?

Yes. We work as a general contractor, specialist contractor or subcontractor - the formats are described on the For partners page.